Tim put in more pipe and added a few sprinkler heads today. Maddie continues to take her job as Inspector and Superintendent very seriously. Rob taught her well. Tim expects to have this part of the job finished on Saturday. Instant lawn will be installed on Monday.
As you can see, Tim has been very busy digging trenches for the sprinkler system this week. He rented a machine to help him do this huge job and managed to get it done in under four hours! He did have a problem at one point and had to use the truck to unstick the big ol' machine. Sadly, I wasn't here to document that part of the adventure.
With the danger of frost finally past, we are ready to begin the process of landscaping the front yard. Since Tim is currently "between jobs", he is taking on a large part of the job himself. The first picture shows Tim enjoying one of his final days of rest and relaxation!
Today Tim finished up breaking out all the bricks around the corner garden and the tree well. Next week he will put in the sprinklers and drip system in preparation for someone else to prepare the soil and lay the sod. We will then create a large native garden in the front part of the yard and add to our flower garden in front of the windows. Add a pathway or two, and a few things to dress up the front porch and voila! The landscape will be complete! Stay tuned....
Big day today! All the appliances were installed and hooked up. My kitchen doesn't seem quite as spacious as it was with no appliances, but it certainly is more functional.I am using the sink and
counter while I'm fixing dinner tonight. Tomorrow I may even use the stove and the dishwasher. I don't want to rush into these things, you know! Tomorrow should be the final inspection and this weekend will be the grand "moving in". Yee Haw!
Last week was a busy one for the kitchen. The guys came to stain the cabinets on Wednesday. I think I really surprised Jarrett when I went with the first sample he prepared. It was perfect, so why complicate it? On Friday, Mirek came to put down the floor tiles. He returned on Saturday to do the grouting. He did a fabulous job with it.
All the subs that K-Co uses have proven to be excellent workers.My own personal K-Co worker cleaned all the grout off the floor today and will seal everything on Wednesday. Once again, my expectations have been exceeded! I believe the cabinets get their hardware installed this week and I think it's time to install appliances. It won't be long before the countertop is in and the kitchen is complete. Yippeee!
Tim started a fence yesterday to extend the backyard a bit. We had to take down the old one when they started building the garage. Yesterday was brick laying day and today was "putting the wood up with two screws so it can dry" day.
As you can see by the picture on the right, we will need to get one more board and have it dry for a month or so, too. Then the boards come down, get put back up and will probably all fit in that same space Now I need to get to work on the overgrown side garden!
On the left is the view from the kitchen passthrough. It's still a bit obstructed by the plastic but it gives you a better idea of how it will look. During the day the plastic wall is pulled over to keep some of the dust out, but we are opening it in the evening to get some air!On the right is the passthrough view from the living room.
The view isn't so clear from here since the old window has been removed and the space is boarded up. Soon it will be a clear view to the back yard. Garage update: The color coat goes on today or tomorrow! They will pour the driveway and walkway at the end of the week or early next week. Meanwhile, Tim is busy building shelves and I've been enjoying the washer and dryer being next to each other. Big smiles at the Miles' house this week!